{"id":22,"date":"2018-02-25T13:35:02","date_gmt":"2018-02-25T13:35:02","guid":{"rendered":"https:\/\/borkyassociates.ng\/dir\/?p=22"},"modified":"2018-02-25T13:35:02","modified_gmt":"2018-02-25T13:35:02","slug":"a-a-rano-petroleum-limited-lpg-petroleum-products-depot-technical-panel-review","status":"publish","type":"post","link":"https:\/\/borkyassociates.ng\/dir\/2018\/02\/25\/a-a-rano-petroleum-limited-lpg-petroleum-products-depot-technical-panel-review\/","title":{"rendered":"A.A Rano Petroleum Limited; LPG\/Petroleum products Depot Technical Panel Review"},"content":{"rendered":"<p>The Environmental Impact Assessment (EIA) review for\u00a0A.A Rano Petroleum Limited; proposed bulk LPG\/Petroleum products Depot is scheduled to hold on Tuesday, February 27, 2018. The environmental impact of the project will be presented before a panel of experts set up by the Honorable Minister of Environment, a panel which includes representatives from the Fedral Ministry of Environment, the Lagos State Ministry of Environment, Amuo-Odofin Local Government, key experts and stakeholders including a representative of the Honorable Minister. The Environmental Impact Assessment and its associated report is being prepared by Borky S G Bakre &amp; Associates Limited&#8217;s team of experts including our Founder and President Borky S G Bakre.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-23 aligncenter\" src=\"https:\/\/borkyassociates.ng\/dir\/wp-content\/uploads\/2018\/02\/IMG_5660-267x300.jpg\" alt=\"\" width=\"267\" height=\"300\" srcset=\"https:\/\/borkyassociates.ng\/dir\/wp-content\/uploads\/2018\/02\/IMG_5660-267x300.jpg 267w, https:\/\/borkyassociates.ng\/dir\/wp-content\/uploads\/2018\/02\/IMG_5660-768x863.jpg 768w, https:\/\/borkyassociates.ng\/dir\/wp-content\/uploads\/2018\/02\/IMG_5660-700x787.jpg 700w, https:\/\/borkyassociates.ng\/dir\/wp-content\/uploads\/2018\/02\/IMG_5660.jpg 1856w\" sizes=\"(max-width: 267px) 100vw, 267px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Environmental Impact Assessment (EIA) review for\u00a0A.A Rano Petroleum Limited; proposed bulk LPG\/Petroleum products Depot is scheduled to hold on Tuesday, February 27, 2018. The environmental impact of the project&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/posts\/22"}],"collection":[{"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/comments?post=22"}],"version-history":[{"count":1,"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/posts\/22\/revisions"}],"predecessor-version":[{"id":24,"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/posts\/22\/revisions\/24"}],"wp:attachment":[{"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/media?parent=22"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/categories?post=22"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/borkyassociates.ng\/dir\/wp-json\/wp\/v2\/tags?post=22"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}